After the bond issue is passed, work begins on what will be the new "dog house"-the new Lexington High School.
July, 2007-the ground has been purchased and the site is staked.

The lot where work will soon begin on the new Lexington High School. This view is looking north from across State Highway 39. The athletic complex is in the background and the old Methodist Church is to the left.

This view is looking northwest from the same location. The old Methodist Church is just to the right of the center.
December, 2007-underslab construction is complete, the foundation and floor slab are poured.
Work begins on the new dog house. Work has begun on the building pad, trying to get drainage on a flat site. This picture is made looking northwest from across SH-39.
Same location, different angle. The contractors con-ex is on site along with other equipment. A dirt entry drive has been installed. The Methodist Church is to the right side of the picture.
Looking east at what will be the west elevation.
Same view, closer.
March, 2007-steel erection has begun. Steel columns, beams and roof trusses are being erected and the interior concrete block walls erection has begun.
Again, looking north from the south side of State Highway 39.
Looking east at what will be the west elevation.
June, 2008-with steel erection complete, the roof deck has been erected. Interior block wall erection continues and exterior sheathing is installed. Split-face block and bricks installation has begun. Parking lot and drives have been cut, curbs have been poured and the base layer of asphalt paving is installed.
Looking north at the main (south) entrance. State Highway 39 is in
the foreground. A concrete drainage channel is shown left center and the
concrete curbs with gutters and asphalt drives and parking are also visible.
Note the installation of the split-faced block and bricks that has started on
the east (right) end of the building.

Looking east at the west elevation. Brick and block work on the exterior continued on the north classroom wings.
September, 2008-exterior brick and block work continued. Window frames and glass are installed. Roof panels are installed.
Looking northwest from the main drive. Note, in the foreground, the top of the asphalt is lower than the concrete gutter it abuts, awaiting final topping.

The front entrance included a covered canopy leading to the entry doors.
December, 2008-exterior brick and block work is completed. Interior finishes and cabinet installation started.
Standing in the Commons Area, looking east at the Administrator suite. Frames and glass are installed, but the doors aren't. Note the can light openings in the soffit and the sprinkler head rough-ins.
A classroom with the drop ceiling grids and troffer light fixtures installed.
A row of lockers that line the east corridor.
One of the two Science Labs beginning to take shape.
The other Science Lab.